Model Engineer Index 1898 to Feb 2025

Year 1979
Date 06-Apr
Volume 145
Issue 3,606
Page 398
Category Railway
Part 2
Title Why Not Run a Railway?
Author Doug Hewson
Notes The trackwork of the Gresley Central Railway, Speedy, Bankside junction, an expansion joint, pointwork and finishing off the trackwork, 1 in 7 common crossing, standard 20 ft. radius switch