| Year | 2018 |
| Date | 07-Dec |
| Volume | 221 |
| Issue | 4,601 |
| Page | 835 |
| Category | Boiler |
| Part | 19 |
| Title | ME Vertical Boiler - Constructing the Boiler |
| Author | Martin Gearing |
| Notes | Adds the lagging and banding to the boiler shell. Fitting the lagging strips, cutting the banding, machining band clamp, silver soldering band clamp to band, fitting lagging and bands |