Model Engineer Index 1898 to Feb 2025

Year 2022
Date 11-Mar
Volume 228
Issue 4,686
Page 388
Category Locomotive
Part 3
Title LNER B1 Locomotive
Author Doug Hewson
Notes Tender Frame Plates. Presents an authentic 5 inch gauge version of Thompson's most successful locomotive. Darlington built V2 tender, Darlington built B1 tender, draw hook, V2 tender water valve, the first locomotive with the squared off frames (photo by the TT), (some photos by Alistair Bootland), tender buffer steel fabrication and casting, tender frame slotting plan, tender frame drilling plan, Doug's special buffer head tool, full-size B1 buffer head