Model Engineer Index 1898 to Feb 2025

Year 1942
Date 26-Mar
Volume 86
Issue 2,133
Page 301
Category Railway
Part
Title Semaphore Signals of the Cheshire Lines Committee
Author O.S.Nock
Notes The former standard C.L.C. lower-quadrant arm and spectacle, present-day two-arm signal on concrete post, C.L.C. 2-arm lower-quadrant signal, Cheadle "up" starter; a typical C.L.C. arrangement, present-day upper-quadrant arm and spectacle, a typical arrangement of splitting signals, bracket signal at Godley with shunt mounted above full sized arm, (photos by G.H.Platt)